Caltrans will build sound walls on Allesandro Street between Oak Glen and Rosebud as a part of the 2 Freeway Terminus Project. Sound walls have been dropped out of all other parts of the project except for this 4/10ths of a mile long stretch. No environmental review was ever conducted regarding the removal of these trees/shrubs and construction of these sound walls in the EIR in 2009.
See how the same part of Allesandro looked in 2009.
State Route 2 Freeway Terminus Redesign Update
Thursday, June 13, 2013*
6 - 8 PM
2414 Mayberry St
Silver Lake , 90026
info: (213) 922-3010
Handy links:
Metro's SR2 Freeway Terminus Project