Monday, November 29, 2010
2 Freeway Terminus Redesign:
Sound Walls Part 2, Allesandro Way
Photo: Diane Edwardson, July 1, 2009. Allesandro Way between Oak Glen and Lake View Ave will lose all the trees and shrubs on the 2 Freeway and get an 8-10' high sound wall. (Shot from Oak Glen looking toward Lake View.) (Click on photos to enlarge.)
Photo: Diane Edwardson, July 1, 2009. An 8-10' high sound wall is planned for the 2 Freeway on Alessandro Way. All of the trees and shrubs will be removed. They only have to replace the trees on a 1:1 basis, with trees nowhere near this size. Is this really an appropriate place for a graffiti canvas? The MTA says their plans have no significant effect on the nearby homes.
Go to the public meeting, Tuesday November 30, 2010.
Labels:
2 Frwy,
2 Frwy Terminus,
Allesandro Way,
graffiti,
Lake View,
Silver Ridge Ave.